We perform all types of geotehnical protections and repairs in cooperation with our longterm partners and subcontractors.
Ser. Num. |
PROJECT NAME |
INVESTOR |
CONSTR. WORK PERIOD |
TYPE OF WORK |
189 |
D 29 ROAD MARIJA BISTRICA - KAŠINA |
HRVATSKE CESTE |
2015 |
Installing micropiles. |
188 |
WSESTGATE SPLIT |
TEHNIKA |
2015 |
Securing the construction pit with IBO anchors, shotcrete and curtain injections. |
187 |
PUMPING STATION BIĐ-BOSUT |
ZAKLADANI STAVEB |
2015 |
Installing permanent and temporary ground anchors. |
186 |
RESIDENTIAL BUILDINGS JURJEVSKA ZAGREB |
KAMGRAD |
2015 |
Installing micropiles Φ 350 mmm. |
185 |
MANDRAĆ HVAR |
SPEGRA INŽENJERING |
2015 |
Supply, drilling, installation and injection micropiles 73/53. |
184 |
RECONSTRUCTION AND EXTENSION OF PRIMARY SCHOOL OREBIĆ |
M-P-BETON |
2014 |
Constructing north slope reinforcement with IBO anchors and shotcrete. |
183 |
MHE PRANČEVIĆ |
SPEGRA INŽENJERING |
2014 |
Conducting investigation work and drilling holes in embankment. |
182 |
HOTEL KOMPAS DUBROVNIK |
KAMGRAD |
2014 |
Constructing slope reinforcement with anchors and shotcrete. |
181 |
POLLUTION SYSTEM SPLIT-SOLIN I. FAZA |
ORCA |
2014 |
Constructing micropiles with an overhead beam for protection of trench collectors on sections where based object are endangered. |
180 |
HOTEL IN STREET OTONA ŽUPANČIĆA ZAGREB |
PLURIMUS DEVELOPMENTS |
2014 |
Static reinforcement of walls with shotcrete. |
179 |
HE MILJACKA |
ORŠANIĆ |
2014 |
Reinforcement tunnel lining and slope with shotcrete. |
178 |
KAŠE DUBROVNIK |
SPEGRA INŽENJERING |
2014 |
Conducting investigation work with continual core drilling. |
177 |
CASTLE MILJANA |
KAMGRAD |
2014 |
Installing micropiles Φ 350 mmm. |
176 |
OFFICE BUILDING ZABA ''JANKOMIR 4'' |
ING-JET |
2014 |
Installing ground anchors. |
175 |
SPG CONTARINI SPLIT |
DALKON ING |
2014 |
Securing the contruction pit with Φ 300 mmm micropiles, anchors and shotcrete. |
174 |
ZAGREB AIRPORT |
VIADUKT |
2014 |
Contruction of drainage wells for lowering water levels and pumping water. |
173 |
HYDRO POWER PLANT DUBROVNIK II FAZA |
GEOKON ZAGREB |
2013-2014 |
Conductig exploration drilling and installing piezometers, continual core drilling up to 328 m, 1500 m done so far. |
172 |
LAZ - MARIJA BISTRICA ROAD |
MEĐIMURJE GRADITELJSTVO |
2012-2013-2014 |
Installing micropiles, ~9000 m installed so far. |
171 |
HVAR POD STINE |
VIADUKT |
2014 |
Collector improvement, installation of micropiles. |
170 |
D 29 ROAD MARIJA BISTRICA - KAŠINA |
MEĐIMURJE GRADITELJSTVO |
2014 |
Instaling permanent anchors. |
169 |
HOTEL PRESIDENT |
KAMGRAD |
2014 |
Consolidating foundations of rooms. |
168 |
HOTEL MLINI |
KAMGRAD |
2014 |
Constructing slope reinforcement with anchors and shotcrete. |
167 |
PUMPING STATION LUKA GAŽENICA |
STRABAG |
2013-2014 |
Constructing curtain injections by the sea, securing a construction pit with anchors and shotcrete. |
166 |
RAIL BRIDGE JELENSKI JARAK |
SPEGRA INŽENJERING |
2013 |
Instaling permanent anchors. |
165 |
HYDRO POWER PLANT PERUČA |
GEOKON |
2013 |
Conducting investigation work with continual core drilling up to the depth of 100m. |
164 |
DREŽNIČKO POLJE |
HRVATSKI GEOLOŠKI INSTITUT |
2013 |
Conducting investigation work with continual core drilling and insstallation of piezometers up to the depth of 80m. |
163 |
ZAGREB GREEN BRIDGE |
HIDROELEKTRA NISKOGRADNJA |
2013 |
Installing ground anchors. |
162 |
MALL OF SPLIT |
MUCIĆ & CO |
2013 |
Installing Φ 800 mmm i Φ 900 mmm AB piles, total of 640 m installed. |
161 |
St. Blasius Church IN STON |
SPEGRA |
2013 |
Installing micropiles around the foundation of the church. |
160 |
HYDRO POWER PLANT ZAKUČAC |
HEP-Proizvodnja |
2013 |
Reinforcement of intake tunnel with contact and consolidation grouting. |
159 |
BRAČ |
JADRANKAMEN |
2013 |
Investigation works, conducting curtain injections in order to separate the sea and stone-pit excavations. |
158 |
OSIJEK AIRPORT |
ZRAČNA LUKA OSIJEK |
2013 |
Field research to determine the state of the operating areas of the pavement construction for the calculation of PCN values. |
157 |
PLAT, DUBROVNIK |
SOKOL |
2013 |
Installing IBO anchors and shotcrete. |
156 |
DUBROVNIK - DEBELI BRIJEG EXPRESSWAY |
GEOKON ZAGREB |
2013 |
Investigation drilling for the Dubrovnik – Debeli brijeg expressway,
Plat – Ćilipi section, 273 m on 19 boreholes done in total. |
155 |
TRANSFORMATION STATION PLAT |
DALEKOVOD |
2013 |
Drilling boreholes for sondes needed for grounding transmission lines. |
154 |
HYDRO POWER PLANT GOJAK |
HEP-Proizvodnja |
2013 |
Reinforcement of intake tunnel with contact and consolidation grouting. |
153 |
TROGIR, MANHOLES ON K3.1 |
BRODOMERKUR |
2013 |
Installing IBO anchors. |
152 |
HYDRO POWER PLANT DUBROVNIK |
HEP-Proizvodnja |
2013 |
Reinforcement of intake tunnel with contact and consolidation grouting. |
151 |
SPG DRAŽANAC, SPLIT |
DALKONING |
2013 |
Securing the construction pit with Φ 300 mm micropiles, rock anchors, shotcrete, jet-grouting and curtain injections. |
150 |
SPG GARIČRADSKA |
ING-JET |
2013 |
Grouting. |
149 |
IVANJA REKA JUNCTION |
GEOINVEST |
2013 |
Pre-drilling for gravel piles. |
148 |
SLAVONSKI BROD-WASTEWATER TREATMENT PLANT |
TEHNIKA |
2012-2013 |
Laying the foundations of the object with jet-grouting columns, 7835 m done in total. |
147 |
STROJARSKA STREET, ZAGREB |
GK GRUPA |
2012 |
Installing Φ 800 mmm AB piles. |
146 |
HYDRO POWER PLANT GOJAK |
HEP-Proizvodnja |
2012 |
Reinforcement of intake tunnel with contact and consolidation grouting. |
145 |
ŽUMBERAK |
GEO-JET |
2012 |
Micropile drilling. |
144 |
HYDRO POWER PLANT DUBROVNIK |
HEP-Proizvodnja |
2012 |
Reinforcement of intake tunnel with contact and consolidation grouting. |
143 |
VILA OBERSTER |
LAPAD GRADITELJ |
2012 |
Strenghtening wall foundations with jet-grouting columns, 500 m done in total. |
142 |
PALACE OF JUSTICE IN KOPRIVNICA |
TEHNIKA |
2012 |
Securing the construction pit with het-grouting columns, driven steel sections, anchors and shotcrete. |
141 |
SD OMIŠ |
GRADNJA OSIJEK |
2012 |
Laying the foundations of the object with jet-grouting columns, 7900 m done in total. |
140 |
KAŠINA-LAZ ROAD |
CESTA-GRAĐENJE/MGT |
2012 |
Restoration of landslides with drilled piles and 40 m self-drilling draines. |
139 |
ISLAND ŠIPAN, KATINO SUMMER ESTATE |
KAMGRAD |
2012 |
Terrain consolidation and curtain injections. |
138 |
VRBANI III |
METROPLAN |
2012 |
Installing ground anchors. |
137 |
SPG SVETICE |
MUCIĆ & CO |
2011 |
Securing the construction pit by installing ground anchors. |
136 |
HYDRO POWER PLANT ZAKUČAC |
HEP-Proizvodnja |
2011 |
Reinforcement of intake tunnel with contact and consolidation grouting. |
135 |
HYDRO POWER PLANT GOJAK |
HEP-Proizvodnja |
2011 |
Reinforcement of intake tunnel with contact and consolidation grouting. |
134 |
HYDRO POWER PLANT DUBROVNIK |
HEP HEP-Proizvodnja |
2011 |
Resinforcement of the intake tunnel. |
133 |
HYDRO POWER PLANT LEŠĆE |
HEP-Proizvodnja |
2011 |
Injecting a grout curtainon the diversion tunnel |
132 |
TOMy KORČULA |
TOMY |
2011 |
Installing IBO anchors. |
131 |
ARENA ZAGREB |
GR.OBRT MR STUDIO |
2011 |
Drilling and grouting the AB wall with a cement mixture. |
130 |
RIJEKA |
OCTOPUS |
2011 |
Installing horizontal deformeters in the levee with continuous tubing. |
129 |
RHE ORLOVAC |
ZAGREB RITTMEYER |
2011 |
Drilling boreholes through reinforced concrete for installing probes. |
128 |
ŠTIKADA POOL |
HEP-Proizvodnja |
2011 |
Conducting investigation drilling and installing piezometers. |
127 |
SPG VRBANI |
GRASA |
2011 |
Injecting shotcrete. |
126 |
SPG VRBANI |
GRASA |
2011 |
Injecting shotcrete. |
125 |
SG DUNJEVAC |
TEHNIKA |
2011 |
Installing trial anchors. |
124 |
PG ŠARENGRADSKA |
SINDIKAT GRADNJA |
2011 |
Installing ground anchors. |
123 |
JADRANKA HOTEL |
KAMGRAD |
2011 |
Grout curtain around pool. |
122 |
INTERECTION VUKOVARSKA-DRŽIĆEVA |
GEOSERVIS AS |
2011 |
Installing piezometers with continuous coring. |
121 |
CITY CENTER |
STIPIĆ |
2011 |
Securing the construction pit, shotcrete. |
120 |
VARŠAVSKA |
HOTO GRUPA |
2010 |
Securing the construction pit, micropiles. |
119 |
THE ACADEMY OF MUSIC |
GRAD ZAGREB |
2010 |
Securing the construction pit, anchors. |
118 |
ST. ILIJA TUNNEL-BIOKOVO |
KONSTRUKTOR-INŽ. |
2010 |
Grouting in the tunnel. |
117 |
BOKANJAČKO BLATO |
GEOKON |
2010 |
Geomechanical investigations. |
116 |
HYDRO POWER PLANT ZAKUČAC |
HEP HEP-Proizvodnja |
2010 |
Reinforcement of intake tunnel with grouting. |
115 |
HYDRO POWER PLANT DUBROVNIK |
HEP HEP-Proizvodnja |
2010 |
Reinforcement of intake tunnel with grouting. |
114 |
PUBLIC GARAGE IN SPLIT |
MUHLOS |
2010 |
Geomechanical investigations. |
113 |
HYDRO POWER PLANT GOJAK |
HEP-Proizvodnja P |
2010 |
Reinforcing detachements in tunnel by grouting. |
112 |
GROUTING GALLERY, HYDRO POWER PLANT LEŠĆE |
HEP-Proizvodnja |
2010 |
Drilling drainage wells. |
111 |
CONCRETE PLUG, HYDRO POWER PLANT LEŠĆE |
HEP-Proizvodnja |
2010 |
Grouting the concrete plug, diversion tunnel |
110 |
CABLE CAR SRĐ |
KAMGRAD |
2010 |
Installing permanent ground anchors from 14 cables 2 m in lenght. |
109 |
BAN CENTAR |
KONSTRUKTOR-INŽ. |
2009 |
Grouting. |
108 |
HOTEL REGENT, ORAŠAC |
HIDROCOMMERCE |
2009 |
Slope reinforcement with anchors. |
107 |
HYDRO POWER PLANT LEŠĆE |
HEP-Proizvodnja |
2009 |
Coducting curtain injections. |
106 |
SPO ZAGREBAČKA |
KAMGRAD |
2009 |
Securing a construction pit, anchors. |
105 |
MOJ DVOR |
GRASA |
2009 |
Installing ground anchors. |
104 |
BOLFAN VINSKI VRH |
VINSKI VRH |
2009 |
Geotechnical investigations. |
103 |
SLATINA GARAGE, OPATIJA |
OSIJEK KOTEKS |
2009 |
Installing IBO sanchors and deformeters. |
102 |
SPO SPINUT |
MUHLOS |
2009 |
Geotechnical investigations. |
101 |
RIJEČINA BRIDGE |
KONSTRUKTOR-INŽ. |
2009 |
Drilling for deformeters. |
100 |
HYDRO POWER PLANT LEŠĆE |
GEOTEHNIKA-INŽ. |
2009 |
Measuring the inclination of deep boreholes from the curtain injections. |
99 |
HYDRO POWER PLANT LEŠĆE |
GEOSONDA |
2009 |
Measuring the inclination of deep boreholes from the curtain injections. |
98 |
HYDRO POWER PLANT LEŠĆE |
HEP, PROIZVODNJA |
2008 |
Contact grouting. |
97 |
SPG MEHANIKA, PULA |
KVARNER WIENER STD |
2008 |
Securing a construction pit. |
96 |
AUTOCOMMERCE BUILDING IN ZAGREB |
INTERKONZALTING |
2008 |
Geomechanical investigations. |
95 |
' SVETI DUH '' REPAIR WORKS ON THE TERRAIN |
'' GEO-JET '' d.o.o. |
2008 |
Installing ground anchors. |
94 |
'TUŠKANAC'' GARAGE IN ZAGREB |
TEHNIKA d.d., ZAGREB |
2008 |
Micropiles and ground anchors. |
93 |
'JAVOROVA KOSA'' TUNNEL |
KONSTRUKTOR-IINŽ. |
2008 |
Grouting anchors under high pressure. |
92 |
PIEZOMETERS, NATIONAL PARK PLITVICE |
JAVNA USTANOVA NP PLITVICE |
2008 |
Investigative drilling and installing piezometer. |
91 |
VRATA TUNNEL |
ARZ |
2008 |
Ground anchors for securing the arch of the cavern. |
90 |
S.N. GETALDIĆEVA, ZAGREB |
CONEX |
2008 |
Geomechanical investigations. |
89 |
SG BARUTANSKI JARAK |
KAMGRAD |
2008 |
Geomechanical investigations. |
88 |
CONCRETE-ELEMENTS PLANT |
ZAGREB BETON |
2008 |
AB piles 400 mm in diameter. |
87 |
BRICO STORE |
TGT ADRIATIC |
2008 |
Geomechanical investigations. |
86 |
SPO DUGO SELO |
MM COMERCE |
2008 |
Securing the construction pit with micropiles. |
85 |
KAŠTELA |
EKO KAŠTELANSKI ZALJEV |
2008 |
Installing micropiles. |
84 |
ČREŠNJEVAC ZAGREB |
IGH |
2008 |
Installing inclinometers. |
83 |
RIJEKA-ZAGREB MOTORWAY |
IGH |
2008 |
Installing inclinometers. |
82 |
SPO VRBANI |
GRASA |
2008 |
Grouting. |
81 |
ZVONIMIR CENTAR |
TEHNIKA |
2008 |
Ground anchors. |
80 |
ROSES OUTLET |
GEOJET |
2008 |
Installing deformeters. |
79 |
RESIDENTIAL AREA SV. DUH |
MEGRAD |
2008 |
Installing inclinometers and deformeters. |
78 |
LIPOVLJANI ROAD |
STSI |
2008 |
Geomechanical investigations. |
77 |
SV. NEDJELJA |
CONEX |
2008 |
Geomechanical investigations and installing deformeters. |
76 |
DAF JASKA |
CONEX |
2008 |
Geomechanical investigations. |
75 |
MOKOŠICA |
APSIDA |
2008 |
Geomechanical investigations. |
74 |
BLATO NA KORČULI |
APSIDA |
2008 |
Geomechanical investigations. |
73 |
EYE POLYCLINIC IN ZAGREB |
TEHNIKA d.d. |
2007 |
Grouting. |
72 |
KONZUM BUILDING IN SENJ |
TEHNIKA d.d. |
2007 |
Self-drilling rock anchors. |
71 |
ZVONIMIR CENTAR |
TEHNIKA d.d. |
2007 |
Ground anchors. |
70 |
PIEZOMETERS, HYDRO POWER PLANT LEŠĆE |
HEP-prizvodnja |
2007 |
Exploratory drilling and installing piezometers. |
69 |
DAM IN HYDRO POWER PLANT LEŠĆE |
HEP |
2007 |
Contact grouting of the juncture between the dam and rock. |
68 |
ENGINE ROOM IN HYDRO POWER PLANT LEŠĆE |
HEP |
2007 |
Geomechanical investigation for the foundation of the engine room. |
67 |
MERKATOR ZAGREB |
GRASA |
2007 |
Installing IBO anchors. |
66 |
VRATA TUNNEL |
CONEX |
2007 |
Geomechanical investigations. |
65 |
SPG TEHNOPANELI |
TEHNOPANELI |
2007 |
Securing pit, ground anchors. |
64 |
SPG KRANJČEVIĆEVA |
CONEX |
2007 |
Securing pit, rock anchors and shotcrete. |
63 |
HOTEL PLAKIR |
KOSIJENAC |
2007 |
Exploratory drilling. |
62 |
O.K. ZELENGAJ |
CONEX |
2007 |
Drainage and micropiles. |
61 |
VIDOVČICA |
CONEX |
2007 |
Shotcrete. |
60 |
GRAND SVETICE |
CONEX |
2007 |
Installing deformeters. |
59 |
PUBLIC GARAGE KVATERNIKOV TRG |
TEHNIKA |
2007 |
Shotcrete. |
58 |
SPO DERENČINOVA |
CONEX |
2007 |
Shotcrete. |
57 |
TUNNEL VRŠEK |
CONEX |
2007 |
Pre-drilling for jet-grouting. |
56 |
ORAŠAC |
APSIDA |
2007 |
Geomechanical investigations. |
55 |
OMBLA BRIDGE |
APSIDA |
2007 |
Geomechanical investigations. |
54 |
BUIĆI |
APSIDA |
2007 |
Geomechanical investigations. |
53 |
LANDSLIDE BREČA, RIJEKA |
HRVATSKE CESTE |
2007 |
Installing ground anchors. |
52 |
ELEMENTARY SCHOOL OŽEGOVIĆ |
CONEX |
2006 |
AB piles, 400 mm in diameter. |
51 |
HYDRO POWER PLANT ZAKUČAC |
HEP-proizvodnja |
2006 |
Contact and consolidation grouting in the tunnel. |
50 |
HYDRO POWER PLANT DUBROVNIK, II PHASE |
HEP-proizvodnja |
2006 |
Exploratory drilling with well logging. |
49 |
LOVRINAČKA STREET |
PZC SPLIT |
2006 |
Slope reinforcement with rock anchors and shotcrete. |
48 |
LOZICA NEAR DUBROVNIK |
APSIDA d.o.o. |
2006 |
Installing ground anchors. |
47 |
SUN GARDENS - ORAŠAC |
APSIDA d.o.o. |
2006 |
Exploratory drilling. |
46 |
SPORTS HALL- BLATO NA KORČULI |
APSIDA d.o.o. |
2006 |
Exploratory drilling. |
45 |
POD VUGLEŠ TUNNEL |
KONSTRUKTOR-INŽ. |
2006 |
Installing derformeters, inclinometers, IBO anchors and drens on the tunnel. |
44 |
HYDRO POWER PLANT LEŠĆE |
KONSTRUKTOR-INŽ. |
2006 |
Curtain injection under the embankment . |
43 |
JAVOROVA KOSA TUNNEL |
STRABAG |
2006 |
Installing inclinometer tubes. |
42 |
'HYDRO POWER PLANT LEŠĆE'' FIELD TRIAL |
HEP |
2005-2006 |
Drilling exploratory-consolidation boreholes. |
41 |
STATE ROAD D – 8, Orehovica – Sv.Kuzam section |
HRVATSKE CESTE d.o.o. |
2005-2006 |
Levee reinforcement with self-drilling anchors and shotcrete. |
40 |
CETINA BRIDGE |
HRVATSKE CESTE d.o.o. |
2005-2006 |
Installing ground anchors on the abutments of the bridge. |
39 |
LANDSLIDE GRMOŠČICA |
GRAD ZAGREB |
2005-2006 |
Installing premanent ground anchors. |
38 |
OFFICE BUILDING ''EURODOM'' |
EUROHERC |
2005 |
Securing the construction pit with ground anchors. |
37 |
SPG ALKOM |
ALKOM, SPLIT |
2005 |
Securing the construction pit with ground anchors and micropiles. |
36 |
SPG GRAWE |
GRAWE |
2005 |
Grouting the pit. |
35 |
SPO HEINZLOVA |
KAMGRAD |
2005 |
Grouting the pit. |
34 |
CONCRETE PIPELINE |
VODOOPSKRBA I ODVODNJA |
2005 |
Grouting the concrete pipeline under residential building. |
33 |
BUSINESS COMPLEX ALMEIRA ZAGREB |
KARST |
2005 |
Drilling boreholes for rock anchors. |
32 |
KAPTOL CENTAR |
CONEX |
2005 |
Grouting the construction pit. |
31 |
BUS STATION DUBROVNIK |
GP DUBROVNIK |
2005 |
Grouting the bus station. |
30 |
BP PREKO - UGLJAN |
INA d.d. |
2005 |
Exploratory drilling. |
29 |
GORAŽĐE i ČIBAĆA |
APSIDA d.o.o. |
2005 |
Exploratory drilling. |
28 |
INTKAE CHANNEL ''HYDRO POWER PLANT ZAVRLJE'' |
HEP |
2004-2005 |
Contact-consolidation grouting of the sides of the channel. |
27 |
SPO BELICO |
BELICO |
2004 |
Securing the construction pit with rock anchors and shotcrete. |
26 |
KUPA RIVER - SISAK |
VODNOGOSPODARSTVO SISAK |
2004 |
Exploratory drilling. |
25 |
WATER STATION COMPLEX ''HYDRO POWER PLANT RAMA'' |
ELEKTROPRIVREDA HZHB |
2004 |
Contact-consolidation grouting of the vertcal manhole and lower water chamber. |
24 |
'HYDRO POWER PLANT ZAKUČAC'' - LEFT INTAKE TUNNEL |
HEP |
2004 |
Contact-consolidation grouting of the intake tunnel. |
23 |
ACCESS TUNNEL ''HE DUBROVNIK'' |
HEP |
2004 |
Contact-consolidation grouting of the sides and the calotte of the tunnel. |
22 |
'KONJSKO'' TUNNEL |
HRVATSKE AUTOCESTE |
2004 |
Contact grouting the junction between the concrete lining and the rocks of the road tunnel. |
21 |
HOTEL LIBERTAS - DUBROVNIK |
SEMBOL - DUBROVNIK |
2004 |
Installing ground and rock anchors in the sustaining wall of the hotel. |
20 |
UNDERGROUND GARAGES in OLD TOWN, RIJEKA |
AUSTROGRAD |
2004 |
Securing the construction pit with ground anchors and micropiles. |
19 |
CEMENT SILO-KOROMAČNO |
STRABAG |
2004 |
Grouting the foundations of the silo. |
18 |
T.C. HOLCIM MILL |
HOLCIM |
2004 |
Consolidation grouting of the field. |
17 |
BUSINESS COMPLEX HUMBOLDTOVA |
CONEX |
2004 |
Installing ground anchors. |
16 |
POOL OF '' JUG '' WATER POLO CLUB |
ALKOM |
2004 |
Installing micropiles. |
15 |
HOTEL LIBERTAS - DUBROVNIK |
SEMBOL - DUBROVNIK |
2004 |
Installing ground and rock anchors in the sustaining wall of the hotel. |
14 |
HOTEL HILTON IMPERIJAL |
GP DUBROVNIK |
2003 |
Strenghtening the hotel walls wih grouting. |
13 |
St. Blasius Church IN DUBROVNIKU |
MINISTARSTVO KULTURE |
2003 |
Investigation works. |
12 |
APATOVAC WATER PLANT |
CONEX |
2003 |
Slope reinforcement with shotcrete, rock anchors and drainge up to 35 m. |
11 |
VIKTOR LENAC |
CONEX |
2003 |
Consolidation grouting of the slope. |
10 |
ACCESS ROAD-ILIJINA GLAVICA, DUBROVNIK |
GP DUBROVNIK |
2003 |
Slope reinforcement with rock anchors and shotcrete. |
9 |
KAUFLAND-RIJEKA |
KAUFLAND |
2003 |
Securing a construction pit with rock anchors and shotcrete. |
8 |
HOTEL CONTINENTAL, OPATIJA |
UGO OPREMA I GRAĐENJE |
2002 |
Securing a construction pit with rock anchors and shotcrete. |
7 |
RADOŠEVAC RESIDENTIAL AREA, SPLIT |
KONSTRUKTOR, SPLIT |
2002 |
Slope reinforcement with rock anchors and shotcrete. |
6 |
C.S. DUJMOVAČA-SPLIT |
EKO KAŠTELANSKI ZALJEV, SPLIT |
2002 |
Securing the construction pit with ground anchors and curtain injections. |
5 |
HOTO BUSINESS TOWER |
HOTO BUSINESS |
2002 |
Securing the construction pit with ground anchors. |
4 |
INTAKE TUNNEL ''HE DUBROVNIK'' |
HEP |
2001 |
Contact grouting of the vertical manhole and intake tunnel. |
3 |
OFFICE AND RESIDENTIAL BUILDING LAZARICA II |
IVANIŠEVIĆ, KONSTRUKTOR-INŽ. |
2001 |
Securing the construction pit with rock anchors. |
2 |
DUBROVNIK BRIDGE |
J.V. WALTER BAU-KONSTRUKTOR-INŽ. |
2000-2001 |
Installing ground anchors on the abutement of the bridge. |
1 |
ŠAMAC BRIDGE |
ZAKLADANI STAVEB |
2000 |
Restoration of the basic meters of the bridge with grouting. |